SpaceX (SPCX) Plans More Than $74 Billion in AI Projects Across Texas and Arizona
Key Takeaways
- •SpaceX shares declined 0.97% to $138.58 after the company announced plans to invest over $74 billion in AI infrastructure split between Texas and Arizona.
- •The Texas project involves a roughly $24 billion supercomputing facility at Starbase that has already created more than 3,000 construction jobs and is expected to support over 500 permanent positions, backed by $220 million in water and wastewater infrastructure commitments.
- •The proposed Arizona campus in Cochise County carries an estimated $50 billion price tag, with nine supercomputing buildings offering up to six gigawatts of power, dry cooling, and zero industrial groundwater use.
- •The Cochise County planning and zoning commission will hold a Dec. 9 hearing in Bisbee on the Arizona application, while tax negotiations between Starbase and Cameron County remain unresolved.
- •SpaceX directed more than 80% of its $18.37 billion second-quarter capital spending toward AI computing, raised $25 billion through an investment-grade bond sale, and posted $7.6 billion in third-quarter AI division revenue, up 830%.

SpaceX (SPCX) shares fell 0.97%, or $1.36, to $138.58 by 11:47 a.m. EST, after rebounding from an intraday low below $137. The move came as the company detailed more than $74 billion in planned artificial-intelligence investment spanning Texas and Arizona. Of that total, the proposed supercomputing campus in Arizona accounts for roughly $50 billion, making it the larger share of the two-state expansion.
The spending plans are split between a roughly $24 billion supercomputing facility at Starbase, in the Rio Grande Valley of South Texas, and a roughly $50 billion AI campus in Cochise County, Arizona, in the state's southeastern corner — two proposals whose scale places power supply, water use, and local tax terms among the key development questions.
SpaceX Plans $24 Billion Texas Facility
SpaceX intends to spend about $24 billion on a supercomputing facility at Starbase, in the Rio Grande Valley of South Texas. The company owns the project site near the Port of Brownsville and plans to generate electricity on site to meet the facility's power needs.
According to SpaceX, the Texas project has already created more than 3,000 construction jobs, and the company expects the facility to support more than 500 permanent positions. SpaceX has also committed $220 million to water and wastewater infrastructure in the Brownsville area, with $40 million of that amount already paid.
As part of the project's development, Brownsville removed about 444 acres from its city limits, with the land absorbed into Starbase, which residents voted to incorporate as a city in 2025. Tax negotiations between Starbase and Cameron County remain ongoing, leaving the project's local tax treatment unresolved.
Arizona's $50 Billion AI Campus Faces Dec. 9 Zoning Hearing
The Arizona project would include nine supercomputing buildings with up to six gigawatts of power, along with as much as 24 gigawatt-hours of battery storage on site. SpaceX has attached a roughly $50 billion price tag to the proposed campus.
Tombstone Resources LLC filed the county application for the roughly 747-acre site. The filing outlines four phases, each of which would provide about 1.5 gigawatts of power. SpaceX plans to use dry cooling at the campus and expects zero industrial groundwater use — commitments that address water consumption, a closely managed resource in Arizona.
The company projects 5,500 construction jobs and 1,000 permanent jobs at the Arizona site. It also anticipates electricity bill reductions of up to 20% for members of the local cooperative. The Cochise County planning and zoning commission will hold a hearing on the application on Dec. 9 in Bisbee, the county seat — a key procedural step for the proposal.
AI Computing Dominates Recent Capital Spending
The two projects follow a quarter of heavy outlays on computing. SpaceX reported $18.37 billion in second-quarter capital spending across its operations, and directed $15.83 billion of that total — more than 80% — toward AI computing, making it the company's dominant capital priority. The company also raised $25 billion through an investment-grade bond sale.
The update left out construction dates, project financing details, and chip suppliers, leaving the funding path and build-out timeline for both campuses undefined. Separately, SpaceX's AI division generated $7.6 billion in third-quarter revenue, an increase of 830%. The company reported $4.40 billion in net income for the quarter under generally accepted accounting principles. Until those details emerge, the Dec. 9 hearing in Bisbee and the ongoing Cameron County tax negotiations stand as the nearest visible milestones for the expansion.