NewsStocksOceanaGold Philippines Advances Potential New Gold-Copper Resource Near Didipio Mine

OceanaGold Philippines Advances Potential New Gold-Copper Resource Near Didipio Mine

Author: Bworldonline·

Key Takeaways

  • •OceanaGold Philippines completed more than 21,000 meters of drilling across 72 holes at the True Blue target in 2025 and 2026, delineating several mineralized zones including a potentially higher-grade section.
  • •Technical work assessing a potential initial mineral resource estimate at True Blue, roughly 800 meters northeast of the Didipio underground mine, is well advanced, according to a Wednesday regulatory filing.
  • •Drilling outside and below the Didipio underground mine's existing resource boundary returned intercepts such as 49.9 meters at 4.56 g/t gold equivalent, supporting the potential expansion of the mineralized system at depth.
  • •As of Nov. 17, the company had completed 34,562 meters of exploration and resource conversion drilling at Didipio this year, supported by expected exploration spending of $10 million.
  • •OceanaGold has not yet quantified how much additional mineral resource the latest results could establish or whether they might increase production or extend the mine's operating life.
OceanaGold Philippines Advances Potential New Gold-Copper Resource Near Didipio Mine

OceanaGold (Philippines), Inc. is pressing ahead with technical work on a potential new gold-copper mineral resource near its Didipio mine in Nueva Vizcaya, after completing an extensive drilling program that identified promising mineralization.

The listed mining company said its True Blue exploration target, located about 800 meters northeast of the Didipio underground mine, could contribute additional mineral resources that may complement existing operations. In a regulatory filing on Wednesday, OceanaGold Philippines said technical work assessing the potential declaration of an initial mineral resource estimate at True Blue is already well advanced. An initial mineral resource estimate is the formal step at which exploration drilling is converted into a quantified statement of a target's tonnage and grade, typically classified into inferred, indicated, and measured categories that reflect the degree of geological confidence.

The company completed more than 21,000 meters of drilling across 72 holes at True Blue in 2025 and 2026, delineating several mineralized zones, including a potentially higher-grade section. Notable intercepts include 102 meters grading 4.14 grams per tonne (g/t) of gold equivalent and 138 meters grading 2.74 g/t. Other drill holes returned 82 meters at 4.48 g/t and 93 meters at 3.28 g/t of gold equivalent. Gold equivalent grades combine the gold and copper content of an intersection into a single gold-based figure, a standard convention for gold-copper deposits.

These intersections are concentrated in the upper portion of the True Blue mineralization, which the company said points to the possible emergence of a higher-grade zone. Additional drilling has also extended known mineralization to the northwest and southwest, increasing confidence in the target's geological characteristics.

True Blue was first explored between 1995 and 1998, before OceanaGold acquired ownership of Didipio. Drilling in 2015 confirmed the presence of mineralization, and exploration resumed in 2025.

"During 2026, we have made significant progress on our drill programs at Didipio, accelerating underground drilling and completing an advanced drilling program at the True Blue target, where technical work is continuing to evaluate the potential for a future Mineral Resource estimate," OceanaGold Philippines President Joan Adaci-Cattiling said.

"Results to date are positive, supporting resource conversion at Didipio and confirming the continuity of mineralization at depth, where the deposit remains open," she added.

Extension below the resource boundary

Apart from True Blue, drilling results indicate that gold-copper mineralization extends below the existing mineral resource boundary of the Didipio underground mine. Surface drilling intersected 14 meters grading 5.32 g/t of gold equivalent in hole DDDH257, while DDDH256 cut 43 meters grading 0.93 g/t outside the existing inferred mineral resource boundary. Underground drilling returned an intersection of 49.9 meters grading 4.56 g/t of gold equivalent in hole RDUG551, including 24.2 meters at 6.47 g/t.

The company said the findings support the potential expansion of the mineralized system at greater depths. "These results will support an update to Didipio's Mineral Resources estimate at year-end 2026 and demonstrate the extension of gold-copper mineralization below the current resource shell, where the deposit remains open at depth," it said. In exploration terminology, a deposit described as "open at depth" is one whose mineralization has been intersected but not yet closed off by drilling, leaving its boundaries to be further defined by future work.

OceanaGold has yet to quantify how much additional mineral resource could be established from the latest drilling results, or whether they could eventually increase production or extend the mine's operating life. Mineral resource estimates are the industry's standard benchmark for translating drilling results into a formally reported measure of deposit size.

Didipio drilling campaign

As of Nov. 17, OceanaGold Philippines had completed 34,562 meters of exploration and resource conversion drilling at Didipio this year, supported by expected exploration spending of $10 million.

Underground drilling resumed in the first quarter, with the number of rigs climbing from one to three; more than 17,000 meters across 45 holes have since been completed. Deeper surface drilling began in the second quarter to evaluate mineralization below the 1,800-meter reduced level, with four drill holes totaling 5,600 meters underway and results already received from the first two.

OceanaGold Philippines has also launched a broader exploration program across its 5,000-hectare Didipio mining tenement. Exploration drilling began in the third quarter with one rig, and a second rig is scheduled for deployment by the end of 2026.

The company operates the Didipio gold-copper mine under a financial or technical assistance agreement, an arrangement under Philippine mining law for large-scale mining operations, with the Philippine government. — Alexandria Grace C. Magno