Baguio Braces for Projected 'Super El Niño' as Tourism Boom Tests Water Supply
Key Takeaways
- •The Baguio Water District is accelerating water security preparations ahead of a projected "Super El Niño" that could strain Baguio's tourism-driven economy.
- •BWD General Manager Salvador Royeca reported that the city's deep well sources have significantly recovered after months of rainfall, though the timing of the next dry season remains uncertain.
- •Three new deep well sources in Montinola, Irisan, and Balacbac are targeted for commissioning before El Niño arrives, while two rainwater harvesting facilities in Buyog and Camp 8 are being developed with city government funding.
- •The Mount Sto. Tomas rainwater harvesting facility was replenished during the southwest monsoon and could support consumption for up to six months, depending on demand and operating conditions.
- •Demand-management measures and alternative supply arrangements are being prepared, with Asin and Camp 6 identified as facing the highest shortage risk, and longer-term plans include exploring bulk water sourcing from the Ambuklao and Binga dams based on a feasibility study with the city and UK governments.

BAGUIO CITY — Baguio's tourism-driven economy could face another major test next year as the city prepares for a projected "Super El Niño," prompting the Baguio Water District (BWD) to accelerate water security measures amid rising demand from residents, businesses and tourists.
BWD General Manager Salvador Royeca has publicly declared that the city's deep well sources have significantly recovered following months of rainfall, resulting in a stronger supply buffer ahead of the anticipated prolonged dry spell. He cautioned, however, that the timing of the next rainy season remains uncertain, and that growing tourist arrivals could further strain available water resources. Those twin uncertainties — when the dry spell begins and how many visitors arrive — frame the window in which the water district is working to complete its preparations.
The water district currently operates 90 pumping stations, including 78 deep well sources, along with two rainwater harvesting facilities. Two additional harvesting facilities in Buyog and Camp 8 are being developed with funding from the city government, while three new deep well sources in Montinola, Irisan and Balacbac are targeted for commissioning before El Niño sets in. That pre-El Niño commissioning target gives residents and businesses a concrete timetable against which the city's readiness can be tracked.
The Mount Sto. Tomas rainwater harvesting facility, meanwhile, was replenished during the southwest monsoon and could support water consumption for up to six months, depending on demand and operating conditions.
Mr. Royeca said BWD is preparing demand-management measures, including adjustments in water distribution and pumping from alternative sources, to cushion areas likely to experience shortages, particularly Asin and Camp 6. Alternative supply arrangements are also being implemented in Barangays QM and Legarda. Asin and Camp 6, where shortage risk is seen as highest, are thus the first areas to watch once the dry spell sets in.
Longer-term plans include exploring bulk water sourcing from the Ambuklao and Binga dams, following a feasibility study undertaken with the city government and the United Kingdom government. Any move toward bulk sourcing would rest on that study's findings, making its outcome a longer-term factor in the city's water planning.
Beyond the immediate threat of El Niño, Mr. Royeca identified watershed degradation and shrinking groundwater recharge areas as major threats to Baguio's long-term economic and tourism sustainability. To strengthen supply reliability, the water district is pursuing pipeline expansion and rehabilitation, leak reduction, catchment development and improved system pressure management.
— Artemio A. Dumlao
Source: BusinessWorld — Baguio braces vs Super El Niño as tourism boom, water demand test supply