Element 29 Drills 1,534.6-Metre Mineralized Interval at Elida Copper Project in Peru
Key Takeaways
- •Element 29 Resources reported its longest mineralized interval to date at the Elida copper project in Peru.
- •Hole ELID035 returned 1,534.6 metres grading 0.34% copper and 0.064% molybdenum.
- •The drilling result extends the known porphyry system well below the current resource.
- •Long mineralized intervals are significant in porphyry copper exploration because continuity and scale can inform future resource updates and mine planning.
- •Element 29 Resources is listed on the TSX Venture Exchange under ECU and trades on the U.S. OTC market under EMTRF.

Element 29 Resources (TSXV: ECU; US-OTC: EMTRF) has drilled the longest mineralized interval reported to date at its Elida copper project in Peru, according to The Northern Miner.
The company said hole ELID035 returned 1,534.6 metres grading 0.34% copper and 0.064% molybdenum. The result extends the project’s porphyry system well below the current resource, according to the report. In porphyry copper exploration, long mineralized intercepts can be important because these deposits are typically large, lower-grade systems where continuity and scale are key inputs for future resource updates and mine-planning work.
Elida is a copper project in Peru, a major global copper-producing country. Element 29 Resources is listed on the TSX Venture Exchange under the ticker ECU and trades on the U.S. OTC market under EMTRF. Copper and molybdenum are commonly associated in porphyry systems, with molybdenum often evaluated as a potential byproduct where grades and metallurgy support it.